Cloud Exit Strategy: How to Migrate from AWS to Bare Metal in 2025
A practical, phased approach to cloud repatriation โ saving 40-60% on infrastructure costs while maintaining performance and reliability for UK businesses.
In 2024, 37% of UK businesses reported cloud costs exceeding budget by more than 25%. The era of "lift and shift" to public cloud is giving way to a more nuanced approach: cloud repatriation โ moving workloads from hyperscale clouds back to dedicated infrastructure.
This guide presents a complete cloud exit strategy for UK businesses considering migration from AWS, GCP, or Azure to bare metal hosting. We'll cover cost analysis, migration planning, execution phases, and common pitfalls to avoid.
Why UK Businesses Are Leaving the Public Cloud
The cloud repatriation trend is accelerating. Here's why UK businesses are making the move:
| Factor | Cloud (AWS/Azure/GCP) | Bare Metal (Hostingowy) |
|---|---|---|
| Monthly cost (32 vCPU, 64GB RAM, 1TB NVMe) | $800-1,200 | $200-400 |
| Data egress fees | $0.05-0.09/GB | $0 (unmetered) |
| UK data sovereignty | Varies by region | European data centres (Poland) |
| Performance consistency | Shared (noisy neighbour) | Dedicated resources |
| Support quality | Enterprise tier: $$$$ | UK engineers, included |
| Vendor lock-in risk | High (proprietary services) | Low (open standards) |
Phase 1: Cost Analysis & Workload Assessment (Week 1-2)
Before migrating, understand exactly what you're spending and where. Use our free cloud cost assessment tool to compare your current cloud spend against bare metal alternatives.
Audit Your Current Cloud Spend
- Export AWS Cost and Usage Report (CUR) or Azure Cost Management data
- Identify the top 10% of resources by cost โ these are your primary candidates
- Calculate effective hourly costs including reserved instance amortisation
- Include data transfer costs (NAT gateway, egress, inter-AZ traffic)
- Add managed service premiums (RDS, ElastiCache, Load Balancers)
Classify Workloads by Migration Suitability
- Tier 1 โ Immediate repatriation: Stateless web servers, batch processing, CI/CD runners
- Tier 2 โ Short-term migration: Stateful applications with clear data sync strategies
- Tier 3 โ Longer-term: Heavy database workloads requiring careful replication
- Stay-in-cloud: Truly elastic workloads (auto-scaling with <5 min peaks), serverless functions
Phase 2: Migration Planning (Week 3-4)
Network Topology Design
Design your bare metal network with redundancy in mind:
โโโโโโโโโโโโโโโ โโโโโโโโโโโโโโโ
โ Primary DC โโโโโโบโ DR DC โ
โ (London) โ โ (Manchester)โ
โโโโโโโโโโโโโโโค โโโโโโโโโโโโโโโค
โ Web Tier โ โ Web Tier โ
โ App Tier โ โ App Tier โ
โ Database โ โ Database โ
โโโโโโโโโโโโโโโ โโโโโโโโโโโโโโโ
โ โ
โโโโโโโโโโฌโโโโโโโโโโโโ
โ
โโโโโโโโดโโโโโโโ
โ DNS (Geo) โ
โ CDN (Cloudflare)โ
โโโโโโโโโโโโโโโ
Data Migration Strategy
For databases, use replication rather than dump-and-restore for zero-downtime:
# PostgreSQL replication setup
# On existing cloud database:
SELECT pg_create_physical_replication_slot('bare_metal_replica');
# On new bare metal server:
pg_basebackup -h cloud-db.example.com -D /var/lib/postgresql/16/main \
--slot=bare_metal_replica --progress --verbose
# Configure streaming replication
# Add to postgresql.conf on bare metal:
primary_conninfo = 'host=cloud-db.example.com port=5432 user=replicator password=****'
Phase 3: Migration Execution (Week 5-8)
Week 5: Network & Security Layer
- Configure VPN or Direct Connect between cloud VPC and bare metal network
- Set up firewalls, WAF, and DDoS protection
- Deploy monitoring (see our Grafana setup guide)
- Configure DNS with low TTL for rapid cutover
Week 6-7: Workload Migration (Staggered)
- Move Tier 1 workloads first (stateless, easy to roll back)
- Run in hybrid mode for 48 hours to validate performance
- Move Tier 2 workloads with data replication
- Final cutover of Tier 3 databases
Week 8: Validation & Decommission
- Run full integration tests from bare metal infrastructure
- Monitor performance, latency, and error rates for 72 hours
- Decommission cloud resources systematically
- Cancel cloud subscriptions โ avoid surprise charges!
Real-World Cost Savings Example
Monthly AWS bill: $24,500
Equivalent Hostingowy dedicated infrastructure: $8,200
Annual savings: $195,600 (66% reduction)
Migration timeline: 6 weeks
Performance improvement: 35% lower latency for UK users
Support response time: 5 minutes (vs 2-4 hours with AWS support)
Common Cloud Exit Pitfalls
Pitfall 1: Ignoring Data Egress Costs
AWS charges $0.09/GB for data transfer out. Moving 10TB before cutover would cost $900. Plan your data migration to minimise egress โ use Direct Connect or ship physical drives.
Pitfall 2: Keeping Unused Resources Running
During migration, it's common to keep old cloud resources "just in case." Set a decommission date and stick to it. Every week of overlap costs 15-25% of your monthly cloud bill.
Pitfall 3: Underestimating Network Engineering
Hybrid cloud setups require careful network engineering. Invest in proper VPN or dedicated connectivity between your bare metal and any remaining cloud resources during transition.
Conclusion
Cloud repatriation is not about rejecting cloud technology โ it's about making the right economic choice for your workload. For UK businesses with predictable workloads, bare metal hosting offers 40-60% cost savings, better performance, and simpler GDPR compliance through guaranteed UK data residency.
Ready to Plan Your Cloud Exit?
Get a free cloud cost assessment and migration plan. Our UK engineering team will help you design your bare metal infrastructure.
Start Your Assessment โRelated reading: Migrate from AWS to Bare Metal โข Dedicated Server vs VPS โข Hostingowy vs AWS